Wednesday, 28 November 2012

The final production meeting - before hand in

Oliver and myself had set up a meeting with Ken, our director, John, our AUCB production manager, and Pete Cliffton, our lighting designer. This has been the first meeting that has had all of us, and now with the finished designs, it was set to be a fairy tense moment - with a week left till hand in and so much work and change already up to this point there was always the worry that something would be deemed wrong and need changing.

Thankfully, everything went tremendously well. John has now set with us that he will want to at the very least cost up the set at the begining of January, and is confident that if the costumes require more budget if it can be saved on set then it can easily be transfered into the costume budget. Pete and Ken have both approved, and love, the costume designs which is a great relief and a joy. I had not expected the joy allongside the relief that they enjoy the costume designs. Again, as I have said before, I think that when you have put so much time and energy into a production in any capacity it is impossible not to become emotionally attached to it.

Now to do

The final three sets of designs + the reworking of Titania
Organising, tidying and binding my sketchbook
My final 500 word evaluation

No comments:

Post a Comment